HUG's Resilient Goods
HUG's Holey Hose Holder 4 Loop (PEX tubing guide)
Couldn't load pickup availability
Only Supports 5/8" or smaller PEX
We found that when installing multiple lines to our HUG Hydronics in-floor heating Tank, the PEX pipes were bound to be uncooperative. We knew we could fix that. In comes HUG's Holey Hose Holder. The more PEX tubes you have, the more useful this will be for keeping them all straight, organized, and safe. The HUG Holey Hose Holder is designed to be installed when laying PEX tubing before concrete is poured.
Key Features:
Lines up with Tank Hydronics System
- Feed and Return Labels
- Supports 5/8" or smaller PEX
- Numerous Mounting Options
- Comes With 8 Rotatable Tubing Guides
- Clean Edge for Concrete Finishing
- Protects the tubing from kinking or damage as it comes out of the concrete.
- Integrates perfectly with the HUG Hydronics in-floor heating system or for organizing another in-floor heating system.
Need a smaller PEX tubing organizer for fewer loops? See the HUG Holey Hose Holder 3 Loop for compact radiant-heating installations.
Need a larger PEX tubing guide for additional loops? See the HUG Holey Hose Holder 10 Loop for the same organized setup with more capacity.

